Service project

Wall cleaning

Wall cleaning

&Nbsp;  , external cleaning clean the exterior of the wall there are two main ways: the hanger plate way and window cleaning.
&Nbsp;   second, the outer wall cleans condition 1, climatic conditions: the outer wall clean must be performed in good weather conditions, the wind should be less than 4, level 4 stopped working. Therefore, the work should be determined before the wind, especially in high wind. In addition, rain, snow, fog, poor visibility and high temperature (more than 35 ℃) and low temperature (0 c) and other conditions are not suitable for wall cleaning.
&Nbsp;   2, equipment conditions: external cleaning of equipment must be in good working condition, where the hanger plate has creepy phenomena such as, part of the strands should be immediately replaced with new ropes.
&Nbsp;   third, must be carefully inspected before work safety rules l, machinery and equipment, tackle, ropes, thwart, seat belts for damage, ensure a good mechanical properties and appliances free of abnormal operation.
&Nbsp;   2, operating rope, safety ropes must be separated from root and tied to death, relying on narrow necked to pad a soft, to prevent wear and rope, rope end must have contact with the ground, ropes were also to temporary safety ropes.
&Nbsp;   3, construction induction before put on overalls, wearing a helmet, induction when the first seat belt lock (safety rope) and then fasten the shackles (action line), while buttons to tight, solid die.
&Nbsp;   under 4, ropes, head upstairs and the construction supervisor to give direction and help.
&Nbsp;   5, when assistive devices to be tightly fastened. In case of wounding, slapstick and no laughing and carrying other unrelated articles; 6, upstairs, the ground guardianship personnel to stand firm on the construction site. Effectively perform their duties. Always observe the operating rope, safety rope tension and rope, the rope phenomenon, found that the problem reports in a timely manner, ruled out.
&Nbsp;   7, floor care workers are not free to walk back and forth on the edge of the roof. You must fasten their safety rope, then aided work. The ground guardianship personnel shall not be read on the construction site, but not free to watch other scenes. And to stop pedestrians from entering dangerous areas and cord, throw rope phenomenon occurrence.
&Nbsp;   8, rope, safety rope required shift operation, when the upper and lower, care workers and ancillary workers have to coordinate together in place, not to lay the rope when tied tightly.
&Nbsp;   9, construction workers when it comes to landing, the first look at the floors, the walls of the facility, operation rope, safety rope localization and pedestrian traffic, pending the ground guardianship personnel, adjusted, approval slowly declined until ground.

PREV: Indoor cleaning

NEXT: No informtation!